Specialists in the Installation & Maintenance of Off-Mains & Land Drainage

Ockham Park, Surrey

Ockham Park, Surrey

Klargester Balance Tank Installation

klargester installation Ockham Park
We installed a Klargester Balance Tank upstream of an existing Biotec Sewage Treatment Plant as the site had increased capacity due to functions
klargester installation Ockham Park
The Balance Tank helps to reduce the shock load on the treatment plant to ensure continued performance and high quality discharged effluent to the downstream watercourse
klargester installation Ockham Park
Interlocking ground shoring is used due to the depth of excavation and unstable ground conditions
klargester installation Ockham Park
Interlocking ground shoring is used due to the depth of excavation and unstable ground conditions
klargester installation Ockham Park
The tank is positioned onto the pre-prepared concrete base
klargester installation Ockham Park
The levels are checked to ensure the tank is at the correct position to receive the drainage connections
klargester installation Ockham Park
The tank is now ready to be backfilled in position in accordance with the manufacturers 'wet site' specifications