Our Recent Work
Klargester Sewage Treatment Plant Installation
Following recommendations from the manufacturers, Boxall Ward contracted in as specialist to install a Klargester Sewage Treatment Plant on new housing development in Sussex.
Complete design and installation project of foul drainage system served by new sewage treatment
Complete design and installation project of foul drainage system served by new sewage treatment, including a back drop man hole to accommodate change in ground levels. Also a swale to deal with surface water which will help maintain a natural environment for wildlife.
Boxall Ward Ltd Installation
Installation in very poor ground conditions on a very wet site with high water table are not a problem to our own full time staff.
French drain and Aco System Installation
French drain and Aco system to protect low lying house from ground water. Ultimately system completely surrounded house and backed up by five pump stations also wired up to back up generator power supply in case of power cut.
Klargester Bioficent Installation
Klargester bioficent system being installed to serve a sports pavilion.
Finishing touches
Finishing touches make all the difference to what can be messy process.









